E-Mail Us
 

Ontario Installations

Holiday Inn, Bracebridge

Previous | Home | Next

This photo was taken during the construction of the dock. It has 6 heavy duty piling brackets holding it. Also, it has a 14' aluminum gang plank connecting it to the existing fixed dock. It has the very first examples of our new stainless steel railings. This dock will be left in all year round.



 

The Dock was assembled in a more convenient location and driven by a boat to its final place.