Ontario Installations
Holiday Inn, Bracebridge
Previous | Home
| Next
This photo was taken during the construction of the dock.
It has 6 heavy duty piling brackets holding it. Also, it has
a 14' aluminum gang plank connecting it to the existing fixed
dock. It has the very first examples of our new stainless
steel railings. This dock will be left in all year round.
|